Everbuild
Elimination of manual handling delivers product consistency improvements
Case Study DownloadSector: Manufacture
Service: Control & Automation
AES was commissioned to design and install the electrical element of a mechanical process which was designed to remove manual handling from the production process and enable Everbuild to benefit from economies of scale and eliminate human errors.
Case Study – Packing Hall Low Energy Lighting
Significantly enhanced staff working conditions with rapid ROI
Read moreCase Study – Energy Storage System
Energy storage system provides cost savings & eliminates production downtime
Read moreCase Study – Everbuild
Elimination of manual handling delivers product consistency improvements
Read moreCase Study – Bibby Turboflex
AES low energy lighting project saves 48% in annual lighting running costs
Read moreCase Study – Kerry Foods
Operational efficiencies maximised with new equipment integration.
Read moreCase Study – Charles F Stead
AES find the right energy reduction solution with 20.75% annual energy savings.
Read moreHave a question or need advice?
Call us today
or email and a member of our
team will get back to you