Everbuild
Elimination of manual handling delivers product consistency improvements
Case Study DownloadSector: Manufacture
Service: Control & Automation
AES was commissioned to design and install the electrical element of a mechanical process which was designed to remove manual handling from the production process and enable Everbuild to benefit from economies of scale and eliminate human errors.
Case Study – Bond it
Mixer refurbishment provides perfect opportunity to make maximum impact
Read more
Case Study – Packing Hall Low Energy Lighting
Significantly enhanced staff working conditions with rapid ROI
Read more
Case Study – Energy Storage System
Energy storage system provides cost savings & eliminates production downtime
Read more
Case Study – Everbuild
Elimination of manual handling delivers product consistency improvements
Read more
Case Study – Bibby Turboflex
AES low energy lighting project saves 48% in annual lighting running costs
Read more
Case Study – Kerry Foods
Operational efficiencies maximised with new equipment integration.
Read more
Have a question or need advice?
Call us today
or email and a member of our
team will get back to you
