Packing Hall Low Energy Lighting
Significantly enhanced staff working conditions with rapid ROI
Case Study DownloadSector: Food Manufacturing
Service: Low Energy Lighting
AES replaced old lighting across a Yorkshire food production factory, with high level and low level lighting which transformed the working environment to bring it in line with H&S regulations.
Case Study – Bond it
Mixer refurbishment provides perfect opportunity to make maximum impact
Read more
Case Study – Packing Hall Low Energy Lighting
Significantly enhanced staff working conditions with rapid ROI
Read more
Case Study – Energy Storage System
Energy storage system provides cost savings & eliminates production downtime
Read more
Case Study – Everbuild
Elimination of manual handling delivers product consistency improvements
Read more
Case Study – Bibby Turboflex
AES low energy lighting project saves 48% in annual lighting running costs
Read more
Case Study – Kerry Foods
Operational efficiencies maximised with new equipment integration.
Read more
Have a question or need advice?
Call us today
or email and a member of our
team will get back to you
