Bibby Turboflex
AES low energy lighting project saves 48% in annual lighting running costs
Case Study DownloadSector: Engineering
Service: Low Energy Lighting
AES’s review and replacement of old lighting with low energy alternatives, reduced annual KWh consumption by 53,928 (48%) and annual CO2 consumption by 28,291 (48%) and saving £4,313 (48%) in annual running costs. What’s more, the working environment was transformed whilst generating a ROI within 16 months.
Case Study – Packing Hall Low Energy Lighting
Significantly enhanced staff working conditions with rapid ROI
Read moreCase Study – Energy Storage System
Energy storage system provides cost savings & eliminates production downtime
Read moreCase Study – Everbuild
Elimination of manual handling delivers product consistency improvements
Read moreCase Study – Bibby Turboflex
AES low energy lighting project saves 48% in annual lighting running costs
Read moreCase Study – Kerry Foods
Operational efficiencies maximised with new equipment integration.
Read moreCase Study – Charles F Stead
AES find the right energy reduction solution with 20.75% annual energy savings.
Read moreHave a question or need advice?
Call us today
or email and a member of our
team will get back to you