Case Study - Rakusens

Rapid response minimises production downtime and prevents safety issues

Case Study Download

Sector: Manufacturing (Construction products)

Service: Reactive Maintenance

AES’s prompt response and fault-finding process managed to significantly minimise production downtime and ensure a safe working environment was maintained.

image description

Challenges

AES received an urgent phone call from Rakusen’s as one of the company’s production lines was down. The drive belt that ran the conveyor belt had stopped working and they didn’t know why. The situation was urgent as the company was losing money every minute that production was halted. AES needed to get to site quickly to immediately check there was no mechanical fault with the motor and work back along the system with logical fault-finding procedures.

image description

Solution

It became clear that while the panel was giving out the correct voltage, it wasn’t right at the motor. Their investigations led to a joint between the panel and motor, which they opened up to discover burnt plastic terminals. The vibration of the machinery had over time caused loose connections, so the arc of electricity had been jumping between terminals, causing heat and melting the plastic. As soon as AES’s engineers replaced the terminals and fired up the machinery, it immediately worked again.

image description

Background

Based in Leeds and founded in 1900, Rakusen’s was the first manufacturer of water crackers in the UK. Today it continues to flame-bake crackers to a traditional recipe – including crackers suitable for the Kosher, vegan, vegetarian and gluten-free markets – along with other products such as biscuits, margarines and soups.

Prev Next
Challenges
Solution
Background

Having worked with AES over a number of years, we’ve always found them to be efficient, prompt and extremely knowledgeable. They’ve never failed to get us back up and running as quickly as possible and with as little disruption as possible. Their electricians are always polite and ready to share their sizeable knowledge on the electronic side of our machines’ workings. We will continue to use them moving forward.

Rakusens
image description

Case Study – Packing Hall Low Energy Lighting

Significantly enhanced staff working conditions with rapid ROI

Read more
image description

Case Study – Energy Storage System

Energy storage system provides cost savings & eliminates production downtime

Read more
image description

Case Study – Everbuild

Elimination of manual handling delivers product consistency improvements

Read more
image description

Case Study – Bibby Turboflex

AES low energy lighting project saves 48% in annual lighting running costs

Read more
image description

Case Study – Kerry Foods

Operational efficiencies maximised with new equipment integration.

Read more
image description

Case Study – Charles F Stead

AES find the right energy reduction solution with 20.75% annual energy savings.

Read more
image description

Have a question or need advice?
Call us today

01924 283 737

or email and a member of our
team will get back to you

info@advancedelectrical.org.uk