Case Study - Rakusens
Rapid response minimises production downtime and prevents safety issues
Case Study DownloadSector: Manufacturing (Construction products)
Service: Reactive Maintenance
AES’s prompt response and fault-finding process managed to significantly minimise production downtime and ensure a safe working environment was maintained.
Case Study – Packing Hall Low Energy Lighting
Significantly enhanced staff working conditions with rapid ROI
Read moreCase Study – Energy Storage System
Energy storage system provides cost savings & eliminates production downtime
Read moreCase Study – Everbuild
Elimination of manual handling delivers product consistency improvements
Read moreCase Study – Bibby Turboflex
AES low energy lighting project saves 48% in annual lighting running costs
Read moreCase Study – Kerry Foods
Operational efficiencies maximised with new equipment integration.
Read moreCase Study – Charles F Stead
AES find the right energy reduction solution with 20.75% annual energy savings.