Smart project planning from AES ensures extension hits deadline and saves money.

Case Study Download

Sector: Manufacturer (mattresses)

Service: Factory Extension Consultancy & Installation

AES’s experience and knowledge enabled the project to be managed very successfully. By carrying out all containment work and cabling run in the same phase ensured less contractors required, saving both time, money and possible aggravation.

image description

Challenges

The company was facing a tight timescale to complete a new extension to the factory intended for the storage of finished products, including additional loading docks. This was due to come online for operational reasons but facing challenges because of the nature of the building and access for construction purposes. First, it was very tight on space, making it difficult for multiple contractors to work at the same time, because the majority of the installation and fitting out required was aerial work.

image description

Solution

Acting as consultants, AES stepped in installed all the electrical services, which included the design and fit out of internal and external lighting; they also provided all the containment and cabling requirements for the fire, intruder alarms, access control and CCTV systems in addition to the heating, data cabling, music and PA systems. The building contractors began digging out the foundations in May and AES were able to begin their work in September. The unit was operational by October and AES then completed the car park and other exterior lighting in November, including LED lighting for new signage on the buildings.

image description

Background

Harrison Spinks is a manufacturer of bespoke hand-made luxury mattresses and divans, using natural materials including wool from sheep raised on its own farm. Established in 1840 and based across four sites on an industrial estate in south Leeds and its own farm and holiday lets business at Bolton Percy, the company has won many awards, including two prestigious Queen’s Awards for Enterprise, in Innovation and Sustainable Development.

Prev Next
Challenges
Solution
Background

I’m very happy with the end result,” says John Berry. “AES did the lighting design and selected and made proposals for the light fittings that matched our requirements in terms of loom levels. It was a top-class job. I’d be very happy to use AES again and certainly happy to recommend them to other customers or prospective customers. We look forward to doing business with them in the future.

Harrison Spinks
image description

Case Study – Packing Hall Low Energy Lighting

Significantly enhanced staff working conditions with rapid ROI

Read more
image description

Case Study – Energy Storage System

Energy storage system provides cost savings & eliminates production downtime

Read more
image description

Case Study – Everbuild

Elimination of manual handling delivers product consistency improvements

Read more
image description

Case Study – Bibby Turboflex

AES low energy lighting project saves 48% in annual lighting running costs

Read more
image description

Case Study – Kerry Foods

Operational efficiencies maximised with new equipment integration.

Read more
image description

Case Study – Charles F Stead

AES find the right energy reduction solution with 20.75% annual energy savings.

Read more
image description

Have a question or need advice?
Call us today

01924 283 737

or email and a member of our
team will get back to you

info@advancedelectrical.org.uk