Case Study - Everbuild

Production downtime minimised whilst ensuring critical Everbuild compliance.

Case Study Download

Sector: Manufacturing (Construction products)

Service: DSEAR/ATEX Compliance Checks

The Advanced Electrical team carried out a full and thorough inspection process (with audit trail) to confirm that all of Everbuild’s installations are DSEAR/ATEX compliant and fit for continued use. Ultimately AES assisted Everbuild with its programme of ongoing continuous improvement.

image description

Challenges

Everbuild stores and processes many hazardous chemicals onsite, including liquids, gases and vapours, which have the potential to create explosive environments. To ensure that its workers, visitors, processes and plant are safe, it is important that the site and plant is periodically checked for both safety and ATEX compliance. To this end, Everbuild requires contractors with CompEx-certified staff to inspect and test the electrical equipment onsite, to make sure that the selection and maintenance of this equipment conforms to current DSEAR/ATEX regulations.

image description

Solution

AES has a long, ongoing relationship with Everbuild, having previously worked on many projects for the company, including completing a recent cooling tank installation and installing a bulk powder transfer system. With several AES engineers now accredited with CompEx certification to work on electrical installations in Potentially Explosive Environments, the company was able to carry out the onsite inspection and testing of electrical equipment to make sure it conforms to current standards. This included working out of hours to reduce the impact on Everbuild’s production output; also at this time hazardous gases and vapours would be minimal. This allowed AES to go in, with the use of a gas detection meter to ensure the work area was within safe working limits, and carry out the works swiftly and in a safe manner.

image description

Background

A world-class manufacturer of sealants, adhesives, fillers and building chemicals for the construction and associated industries, Everbuild operates from a large UK base located at Cross Green Industrial Estate in Leeds, West Yorkshire.  Owned by global company Sika AG, Everbuild has seen rapid expansion in recent years.

Prev Next
Challenges
Solution
Background

The work carried out by Advanced Electrical was to a high standard and completed on time and to budget. We will definitely be using the company again and recommending their services.

Luke Erlank, Engineering Manager
image description

Case Study – Packing Hall Low Energy Lighting

Significantly enhanced staff working conditions with rapid ROI

Read more
image description

Case Study – Energy Storage System

Energy storage system provides cost savings & eliminates production downtime

Read more
image description

Case Study – Everbuild

Elimination of manual handling delivers product consistency improvements

Read more
image description

Case Study – Bibby Turboflex

AES low energy lighting project saves 48% in annual lighting running costs

Read more
image description

Case Study – Kerry Foods

Operational efficiencies maximised with new equipment integration.

Read more
image description

Case Study – Charles F Stead

AES find the right energy reduction solution with 20.75% annual energy savings.

Read more
image description