Case Study - Beech Hill School
New electrical supply allows for 50% additional growth
Case Study DownloadSector: Schools
Service: Power & Distribution & Switchgear upgrade
AES intervention ensured that the school overcame electrical downtime issues due to overloading and upgraded its supply to future-proof the school and enable it to potentially grow the school by 50%.
Case Study – Packing Hall Low Energy Lighting
Significantly enhanced staff working conditions with rapid ROI
Read moreCase Study – Energy Storage System
Energy storage system provides cost savings & eliminates production downtime
Read moreCase Study – Everbuild
Elimination of manual handling delivers product consistency improvements
Read moreCase Study – Bibby Turboflex
AES low energy lighting project saves 48% in annual lighting running costs
Read moreCase Study – Kerry Foods
Operational efficiencies maximised with new equipment integration.
Read moreCase Study – Charles F Stead
AES find the right energy reduction solution with 20.75% annual energy savings.
Read moreHave a question or need advice?
Call us today
or email and a member of our
team will get back to you