Case Study - Harrison Spinks
Smart project planning from AES ensures extension hits deadline and saves money.
Case Study DownloadSector: Manufacturer (mattresses)
Service: Factory Extension Consultancy & Installation
AES’s experience and knowledge enabled the project to be managed very successfully. By carrying out all containment work and cabling run in the same phase ensured less contractors required, saving both time, money and possible aggravation.
Case Study – Packing Hall Low Energy Lighting
Significantly enhanced staff working conditions with rapid ROI
Read moreCase Study – Energy Storage System
Energy storage system provides cost savings & eliminates production downtime
Read moreCase Study – Everbuild
Elimination of manual handling delivers product consistency improvements
Read moreCase Study – Bibby Turboflex
AES low energy lighting project saves 48% in annual lighting running costs
Read moreCase Study – Kerry Foods
Operational efficiencies maximised with new equipment integration.
Read moreCase Study – Charles F Stead
AES find the right energy reduction solution with 20.75% annual energy savings.
Read moreHave a question or need advice?
Call us today
or email and a member of our
team will get back to you