Case Study - Harrison Spinks
Smart project planning from AES ensures extension hits deadline and saves money.
Case Study DownloadSector: Manufacturer (mattresses)
Service: Factory Extension Consultancy & Installation
AES’s experience and knowledge enabled the project to be managed very successfully. By carrying out all containment work and cabling run in the same phase ensured less contractors required, saving both time, money and possible aggravation.
Case Study – Bond it
Mixer refurbishment provides perfect opportunity to make maximum impact
Read more
Case Study – Packing Hall Low Energy Lighting
Significantly enhanced staff working conditions with rapid ROI
Read more
Case Study – Energy Storage System
Energy storage system provides cost savings & eliminates production downtime
Read more
Case Study – Everbuild
Elimination of manual handling delivers product consistency improvements
Read more
Case Study – Bibby Turboflex
AES low energy lighting project saves 48% in annual lighting running costs
Read more
Case Study – Kerry Foods
Operational efficiencies maximised with new equipment integration.
Read more
Have a question or need advice?
Call us today
or email and a member of our
team will get back to you
