Sector: Manufacturer (Boards)

Service: Machine control panel upgrade

AES improve production efficiency by simplifying critical machine controls and producing detailed documentation. This means that now engineers can fault find much quicker which significantly minimises production downtime.

image description

Challenges

We all know that old machinery is likely to be inefficient and liable to break down. To make matters worse, it often doesn’t have any documentation, so when everything grinds to a halt, you really are up the proverbial creek without a paddle. This was the situation we found at Galmay. One of the most important machines on the process line was limping along but had become unreliable in its old age. To compound the issue, there was no documentation. The role of the DET machine is to cut laminated MDF boards to an adjustable pre-determined width, using two circular saw cutting blades. When the machine is halted, 2no.DC Braking units stop the blades quickly, for safety reasons and to meet PUWER regulations. Before Board Services purchased the DET machine, it was part of an old but bespoke automated production line. As the automated plant had been split, the control panel contained several redundant mechanisms, such as options to run motors at different speeds and various other features, including motor braking units.

image description

Solution

AES designed and built a bespoke control panel for the DET Machine, and in order to save the client costs, we reused the existing braking units, as they were relatively new and in good working order. To improve the functional safety of the machine, we designed a safety circuit with the braking units that ensured the safe standstill of the blades. This circuit included a safety relay, a safety ‘delay off’ timer and monitoring of components for common causes of failure. AES also installed a programmable relay, so that modifications to the process could be easily implemented, with room for expansion. This allowed for any future sensors required, which could give the machine an automatic function and save energy. We also rewired the field wiring of the machine, as it was old and in poor shape. To ensure minimum disruption to the company’s production schedule, the panel changeover was carried out at a time to suit Board Services. Upon completion, we provided detailed electrical schematic diagrams, testing and certification, giving the customer peace of mind and helping to future proof the system.

image description

Background

Galmay (Board Services) are a Leeds company that manufactures MDF laminated boards for a variety of industries.

Prev Next
Challenges
Solution
Background

Each breakdown was costing a fortune, as without documentation it took the engineer longer to understand the control and power circuits, which meant a bigger bill for his services and the machine being out of commission for longer, with a knock-on effect on production.

Galmay
image description

Case Study – Packing Hall Low Energy Lighting

Significantly enhanced staff working conditions with rapid ROI

Read more
image description

Case Study – Energy Storage System

Energy storage system provides cost savings & eliminates production downtime

Read more
image description

Case Study – Everbuild

Elimination of manual handling delivers product consistency improvements

Read more
image description

Case Study – Bibby Turboflex

AES low energy lighting project saves 48% in annual lighting running costs

Read more
image description

Case Study – Kerry Foods

Operational efficiencies maximised with new equipment integration.

Read more
image description

Case Study – Charles F Stead

AES find the right energy reduction solution with 20.75% annual energy savings.

Read more