Case Study - Everbuild

Lighting audit and installation delivers savings of £11K per annum

Case Study Download

Sector: Manufacturing (Construction products)

Service: Lighting Control

AES’s audit and recommendation on lighting control measures ensured that manufacturing and storage areas alone delivered £11k per annum savings, in addition to significantly improving the working environment.

image description

Challenges

Sealant manufacturer Everbuild Building Products Ltd were spending unnecessary money on electricity with old fittings that didn’t light their manufacturing and storage area particularly well. When AES reviewed the area, they found old 400w metal halide light fittings in use 16 hours a day with an average light level of just 100 lux.

image description

Solution

AES replaced the metal halide fittings with 4 x 54w T5 light fittings which have an integral presence sensor. It was not necessary to modify the existing wiring. As a result, the new lights are only used when they are needed, the average light level has increased to 200 lux, and Everbuild are saving £11,188 (60%) per annum on their running costs. The entire project produced a return on investment within just 32 months. All work was tested and certified to BS7671.

image description

Background

A world-class manufacturer of sealants, adhesives, fillers and building chemicals for the construction and associated industries, Everbuild operates from a large UK base located at Cross Green Industrial Estate in Leeds, West Yorkshire. Owned by global company Sika AG, Everbuild has seen rapid expansion in recent years.

Prev Next
Challenges
Solution
Background

We are so pleased with the savings AES have made for us, we have asked them back to review and replace the rest of our lighting. We know we will get a better working environment and a substantial return on investment, so it is definitely worth it.

Paul Wood – Everbuild
image description

Case Study – Packing Hall Low Energy Lighting

Significantly enhanced staff working conditions with rapid ROI

Read more
image description

Case Study – Energy Storage System

Energy storage system provides cost savings & eliminates production downtime

Read more
image description

Case Study – Everbuild

Elimination of manual handling delivers product consistency improvements

Read more
image description

Case Study – Bibby Turboflex

AES low energy lighting project saves 48% in annual lighting running costs

Read more
image description

Case Study – Kerry Foods

Operational efficiencies maximised with new equipment integration.

Read more
image description

Case Study – Charles F Stead

AES find the right energy reduction solution with 20.75% annual energy savings.

Read more
image description

Have a question or need advice?
Call us today

01924 283 737

or email and a member of our
team will get back to you

info@advancedelectrical.org.uk