Sector: Stone Cutting Tools
Service: Machine upgrade & control panel
AES’s successful upgrade and retrofitting of a bespoke control panel saw 50-Horse-Power grinder braking time reduced from over 4 minutes to 12 seconds, in a cost-effective manner. This also ensured that the Provision and Use of Work Equipment Regulations 1998 (PUWER) were met.

Case Study – Bibby Turboflex
AES low energy lighting project saves 48% in annual lighting running costs
Read more
Case Study – Kerry Foods
Operational efficiencies maximised with new equipment integration.
Read more
Case Study – Charles F Stead
AES find the right energy reduction solution with 20.75% annual energy savings.
Read more
Case Study – HSG Bradford
Flexibility key in creating new state-of-the-art energy efficient building on schedule.
Read more
Case Study – Rakusens
Rapid response minimises production downtime and prevents safety issues
Read more
Have a question or need advice?
Call us today
or email and a member of our
team will get back to you